Saturday, 29 March 2014

Oracle Primavera Top 50 Tips and Tricks- 50 downloadable videos

Oracle primavera is the best planning and scheduling tool ever. However, beginners and non-experienced users are using only 30% of the primavera version 6 power. In this topic, I will explain in video the most 50 powerful tips and tricks for more professional and faster works using primavera.


 


 


How it works?


  • I will make a separate video about 2 to 5 minutes to each primavera tip or trick.

  • Whoever buy this product before 15th April 2014 will be able to contribute and ask for oracle primavera software tips and tricks until we reach total of 50 by 15th April 2014.

  • The buyer can ask for a specific tip or trick to be included since the list below is not full or the explanations will not exceed 2 to 5 minutes.

  • All the tips and tricks will be available to the buyers by 15th April 2014 to download and watch offline.

  • The price of the whole 50 primavira tutorials is 50$ (1 $ per tip) until 15th April, after that date the price will be increased to 75$.

List of primavera tips and tricks (will be updated from the buyer’s inputs)


 




























































































































































S.N



Description



Status



1



2



3



4



5



6



7



8



9



10



11



12



13



14



15



16



17



18



19



20



21



22



23



24



25



26



27



28



29



30



31



32



33



34



35



36



37



38



39



40



41



42



43



44



45



46



47



48



49



50



Oracle Primavera Top 50 Tips and Tricks- 50 downloadable videos

No comments:

Post a Comment

مهندس تخطيطمهندس تخطيط

Error loading feed.

Planification IngénieurPlanification Ingénieur

Error loading feed.