Showing posts with label baseline. Show all posts
Showing posts with label baseline. Show all posts

Sunday, 20 April 2014

How to copy a project from one EPS to other

How to copy a project from one EPS to other


It is explained in this video how to copy a program with or without baseline, cost or relationships etc from one EPS to another.


[level-premium]


[/level-premium]



How to copy a project from one EPS to other

Thursday, 17 April 2014

How to export a program with baseline in Primavera P6.

How to export a program with baseline in Primavera P6.


Current program with assigned baseline can not be exported together. Complete procedure is explained how to export a current program and assigned baseline in this video.


[level-premium]


[/level-premium]



How to export a program with baseline in Primavera P6.

Planning EngineerPlanning Engineer

مهندس تخطيطمهندس تخطيط

Planification IngénieurPlanification Ingénieur