Wednesday, 30 April 2014

Avoiding death and accidents on site

Over the past years, it has not been new news to hear about worker deaths on construction sites. The sad part about all this is that these deaths could have been avoided if the project managers had some knowledge on ways of avoiding deaths while on site. The aim of this description is to make sure that the deaths on the site are reduced and if possible avoided completely.


Procedure


Prevention is always better than cure. Site workers need to have protective gear even as they are working. The protective gear will help the workers not get injured so much in the event of accidents. On site deaths can be very devastating to the workers and will have a very negative impact on your reputation and so you have to avoid this at all cost.



Scaffoldings are some of the most common causes of accidents at the site and can lead to death depending on the impact. Scaffolding should always be done with persons who are skilled and qualified in that area. The workers on the site should not be left to do the scaffolding. If death occurs due to poor scaffolding, coping death can be very hard for the workers as they will feel very guilty.


Worker deaths can also be avoided if the site is lit well. You have to make sure that the site workers are working in the proper lighting at all times to avoid slips and falls. It is very dangerous if the lighting is poor because accidents that could be avoided may be hard to avoid. The lighting should be just right. It should not be too bright neither should it be dim.


The site workers also need to make sure that they take measures to protect themselves from accidents. Some of the on site deaths can be avoided if the site workers also take responsibility for their safety. Behaviors such as using the phone while driving or driving aggressively are some of the common behaviors of the site workers that need to be avoid. The site workers also have to make sure that they do not work under the influence of drugs or alcohol.


The project managers have to make sure that they abode by the construction regulations at all times. These regulations are there to protect the workers from accidents and even death. Abiding by these regulations will help reduce and even prevent the site deaths. Death can also delay the project especially if it is due to negligence from the project managers.


Safety equipment needs to be in the right condition and they need to be regularly checked. This will help prevent site deaths by a large percentage. The site workers also need to be informed of how to use the safety equipments. This is very essential and should never be taken for granted. The project team does not need to thing about maters of coping death or death on the site if these simple things are followed.




Avoiding death and accidents on site

Monday, 28 April 2014

DEALING WITH DISHONEST AND LAZY WORKERS

The prosperity of any project lies in the amount of input one puts in, it maybe capital, labor and time. These three factors are so crucial; in this section shall show various factors inhibiting maximum project labor input especially dishonesty and laziness among workers. Training workers process and procedure shall also be dealt with.


It’s said prevention is better than cure, before employing a worker check his or her backgrounds thoroughly this will help you avoid dishonest workers. Of course one or two may make without their earlier dishonesty/ laziness uncovered, due to his/her smartness.


In case you finding a suspected dishonest worker in your company, get proof of his/her dishonesty. Never blindly believe your workers word, find enough proof to avoid putting the company at risk or punishing the worker who could be innocent.


Training workers is very important step in avoiding lazy workers. Well trained personnel never fails to give the best, to some extend it helps in reducing chances of employing a dishonest worker. It’s because training equips one with skill and knowledge to carry out the project labor demands. He knows when, how, why and what to do the recommended work.


The workers past must be reviewed and a thorough background check must be taken. Get evidence from the former employer if need be. Confront the dishonest worker after you have proven his dishonesty or laziness. Impose consequences on the worker if he or she cheated on her background, use the evidence you collected to make the dishonest worker see her fault.


If the worker is too lazy he must be monitored, never give him a chance to continue with his/her laziness. It’s through monitoring that this vice won’t spread to other workers; this will make th



e project labor demand is always met. The management should not put two lazy workers on the same working group. Those who are lazy must be put at a place they can be seen easily.


The company must employ workers from a reputable training workers institute, the training is very important. The project labor doesn’t only need quantity but quality input. For quality input there must be proper training.


The world keep changing all the time, the same ideas can’t be used over and over again. The company must always make sure that the process of training workers continue; through seminars, attending exhibitions and tours. It seems hard to deal with lazy workers due to many issues and problems. Some people consider it simple to fix such problems. The use of paid services of working is best. In order to deal with workers, one can introduce new offers and techniques. The training is crucial and mandatory for workers in the world. It makes the workers able to offer best performance and services in the company. Hence most of companies wish to use such company services. Now various types of training programs are available for the benefit of workers and employers in the whole world.



DEALING WITH DISHONEST AND LAZY WORKERS

Delivering projects on record time

For one to succeed as a Project Manager Personnel, he/she needs to deliver projects on time and within budget requirements. But project delivery on time is not as easy as it sounds in most cases. Many fail in timely delivery of their projects. So how can one put processes in place to help him to deliver the projects on schedule? Here are some suggestions and by following some simple steps.


The managing delivery group must calculate the time spent undertaking all the tasks in a project. The task undertaken must be identified and the cost which involves the control of the level of recourse allocated to tasks. The group must monitor the completion of the tasks and identify the outstanding work needed to finish a task before project delivery.This will make good use of the available time, which is precious.


The document time sheet must be put in place to ensure timely delivery of the project. Every worker must provide his/her worksheet and it must be accurate. They shouldn’t wait till the end of the project to start preparing. The managing delivery personnel must receive the workers worksheets on a weekly basis. This will make the process of project delivery quick and easy. Besides, the report will be accurate because no information will be left out.


The project reports must always be updated all the time by the managing delivery personnel, especially on the progress, work done and what to be done. He/she must be notified in



case there is a request for assistance, change in personnel allocation and in case more time for the project delivery need to be extended due to delays and in case of an emergency.


Timely delivery of any report is so important for the health of any project, the progress made can be seen. It also shows how the managing delivery team is effective. Many projects


couldn’t be failing in case the managing team is to the par and its giving all the best to make sure that the running of the project is smooth.


Any Project to be done needs inceptions and preliminary planning’s need thoughtful definition of goals and needs, master plan to accommodate anticipated future requirements, to evaluate project alternatives, identify site requirements, funding needs, budget authorization cycles of the project, and lastly the phasing of the project. This role must be played by the managing personnel.


Each project needs some requirements and skills to resolve the business problems in a better way. The fast and timely delivery of good and products is very important for the company reputation. In case of no or late delivery, the company can face some problems. Hence, the company owners always try to deliver the projects on time. The managing delivery service is not very simple instead; it requires more skills and energy. The use of training program is best for the sake of workers and staff. The company owners like to offer the free training to their workers to have best features.



Delivering projects on record time

Sunday, 27 April 2014

Environmental hazards capable of militating against your projects

There are times when no matter how much you try to avoid hazards they just seem to happen. This can be very frustrating especially of the hazards are caused by things that are under your control. Environmental hazards are these sorts of hazards that you most certainly cannot avoid but you can try and protect yourself from these hazards. The scope of this description is to make sure that you are aware of the different problems that can be due to natural issues and the best ways to protect yourself against these problems.


Procedure


Fire hazards are an example of fires than can come about because of natural conditions such as a heat wave. The best way that you can protect yourself against such a hazard is by making sure that you always have a fire extinguisher with you at all times. This needs to be strategically placed on the construction site. You also need to make sure that you always have the contacts of a good fire extinguisher company. In this case you will be able to reduce fire accidents that can lead to project failure.




Heavy rains are also a very common culprit to project failure. When there is a very heavy downpour and you have not yet well secured the constrictions then there can be falls. These can lead to a lot of accidents on the construction site. One of the beast ways that you can avert this problem is to try as much as possible to make sure that you do the project when the weather is favorable. Though the weather can be unpredictable it is always good to be on the safe side than to be sorry.


Toxic chemicals are also natural issues that have the potential to affect the project that you are working on tremendously. This is the sort of hazard that can be averted by making sure that you have done sufficient inspection of the soil and the area that you are working on before starting the construction. There are instances where accidents have happened because people inhaled toxic chemicals such as sodium hydroxide from the construction site. When this happens on your site you might be held responsible even though it was not your fault that this happened.


Environmental hazards need to be looked into while assessing the risks of the project. This is simply because of the fact that these hazards have the potential to have a very bad impact on the workers’ health directly or indirectly. You as the project manager are charged with the responsibility of making sure that the site workers are always very well taken care of. You therefore have to make sure that the environmental issues that may arise are very well taken care of by taking all the necessary precautions to prevent these issues from taking place. There are so many issues that may arise and these are just some of the issues that may arise that need to be taken into consideration.



Environmental hazards capable of militating against your projects

Friday, 25 April 2014

Monitoring and Controling Excel Sheet, From Primavera to Excel by one click!

The must have Excel sheet for every Planning Engineer, Project Manager, Construction Manager, and whoever is involved in monitoring and controlling projects. I created this Excel sheet from my best practices working as Planning Manager during my 11 years experiences. Do the scheduling in Primavera, and the Reporting, Monitoring, and Controlling in Excel. or even do both in ECXEL!


Watch the following videos for more information about monitoring and controlling excel sheet:


 
Check out how to convert a primavera schedule to the excel sheet format in minutes:




Calculate the Planned values, Planned %, and Planned Quantities Automatically.

  • Create Bar chart, Histograms, Monitoring Sheets, Productivity Sheets Automatically.

  • No need to retype or create new schedule, copy from Primavera directly to the Excel.

  • Free Update for 1 Year. I am continually adding features to this sheet, All the updates will be send to you for a whole year!.

  • Do professional reports, and Monitor your projects effectively.

  • Free Support for 1 Year.

Note: All new tutorials, learning materials, and New versions of the sheet will be sent by Email to the buyers and i will update it here ass well.





Monitoring and Controling Excel Sheet, From Primavera to Excel by one click!

First Aid and injuries on site

The site is not always the best place to be. Accidents are prone to happen and site injury is always quite common. Some of the project injuries can be avoided and if not first aid measures can be taken immediately so as to avoid deaths or worsening of the conditions. The scope of this description is to enlighten the project managers on some of the accidents that can occur on site and the possible ways on managing the injuries.


Procedure


Bruises and fractures can happen and will happen from time to time to the site members. These are not very dangerous accidents and can be managed with simple first aid on site measures. The person that has been bruised or had a fractured is to rest for some time. The place can then be iced and compressed then elevated. This will take just a few minutes and the person can get back to work in a short time.



Electrical injuries are also very common site injuries. These can be cause by poor installation or shocks as the installation is taking place. The first thing you need to do is to make sure that you don’t move the person or touch them. You then need to call the hospital if the shock was due to a high voltage and the person does not come to.


Dislocations and repetitive stress injuries are also injuries that can need to be given some first aid on site treatment when they occur so that they don’t become very severe. Repetitive stress injuries are mostly due to repeated actions. These can be avoided if the site workers change their motions from time to time.


Some site injuries are usually very simple to resolve but others require that you do some CPR to the injured person. CPR is very simple but you have to make sure that you call 911 even before you decide to do the procedure. You then need to check if the person is breathing or if they are having difficulties breathing. After you have done this you have to do some chest compressions and check on the worker who has been hurt. If this does not work you then have to do mouth to mouth resuscitation. Altitude sickness is an example of injury that may require such attention.


Cuts are scrapes are also common project injuries that can be happen as the workers are doing the construction. For these you need to make sure that you have a first aid kit with swabs ready for doing some first aid. The injured worker needs to first of all make sure that they stop what they are doing. They then need to look for a disinfectant and disinfect the cut or scrape. If the cut is too deep and done with a blunt and rusty thing then the person will need tetanus shot. You as the project manager need to make sure that you take the responsibility of paying the bills of the injured workers.



First Aid and injuries on site

Exploring the best approach to achieving tasks

If you want a project to be a success, then you have to make sure that you are aware of the best ways to handle and manage the tasks of the project. A project has to have tasks that need to be performed and results produced for it to become a success. The scope of this procedure is to ensure that the tasks are running as they should so that the project can be a success. It is a guide to help in ensuring that results are achieved from the different tasks performed.


Procedure


Failure to plan is planning to fail. A project needs to have very good planning for it to become a success. The plan needs to be drafted very well and the tasks need to be defined and a timeline set for achieving the tasks. You also have to make sure that you have the right number of personnel task achievement.



Good project management also requires that you come up with a system where you can be able to get feedback from the site workers. You need to have a way of knowing the progress of the project and how the tasks are being performed. There is also need to check the problems that have been encountered and the possible ways of dealing with these problems.


When faced with the challenge of limited resources, the project manager needs to look for the best approach to manage the limited resources. The resources need to be directed with the projects that are most important and then the rest of the resources can be managed on the other resources.


Before you start the different tasks it is also very important that the risks of the different tasks be looked into. There is no need of starting a task and then start to panic when you face these risks.


The goal of the project needs to be defined very clearly. This will help in coming up with the right tasks that will help in achieving these goals. You have to make sure that the objectives are also well drafted and that the tasks that you come up with are in line with the tasks that you have outlined. This will help in making sure that task achievement is possible.


Motivating the workers is also a top best approach in achieving tasks. The workers need to be happy when they are working on the project if you want to get results. You can look for the different ways of making the workers motivated from time to time.


Proper project management that will lead to achieving the tasks also requires that you recognize that the workers require some rest. You should never strain the workers in any way so that you can achieve the tasks. This will lead to task achievement but the task achievement will not be done in the right manner. The overall end product of the project will be of a very poor quality. Always make sure that the working timeline is a reasonable one.



Exploring the best approach to achieving tasks

Thursday, 24 April 2014

Having a budget that ensures profitability budget profit

Budgeting is a crucial stage in any business project; all the steps of budgeting must be followedin the later to make sure that an ideal budget is created.  The annual budgeting process must be well documented, with duties, duty assignments and deadlines clearly outlined. The managing committee must be set up to be involved in managing project tasks. The head of the group must be appointed and all the relevant leaders to spearhead the project activities and to fasten decision making.


After the project has been created the ideas must be put to use through project managing activities. The organization must create a surplus budget that will maximize the use of the available input and maximize the project profit. All the expenses must be included in the budget to avoid unplanned usage of the project resource.


Managing project processes involve assessing the progress of the project to check if it’s making a profit or a loss. An effective project budget must be able to cater for the changes in ma



rket trends by allocating resources for that. The spreadsheet is an important tool for any budget those managing the project must learn to know how to use a spreadsheet. The spreadsheet is so important because it will show a full report and a summary of the project process. If the project profit is deprecated or appreciating it will be seen in the trend of the project progress.


The act of taking responsibility is very important in any project; the project managing group during the managing project process allocates every member with duties to do. The group must assign the personnel well, those who under achieving their set goal can be noted and a correct measure of correction can be taken. It’s through this will be able to identify the channel of losses, hence maximizing project profit made by the project.


The budget must be reviewed more often, to make sure that no single step in the budget is left out throughout the project financial time. It this is not done the project goals will be jeopardized, funds will be used for the wrong purpose and even embezzled by the managing committee. As a result of this the managing project committee would have failed this will make the project to fail too. By doing all these the project profit goal will be attained, if it fails, there is another chance for improvement.  The budget is very important for a company or firm in the world. It is important to fulfill the needs of company within present budget range. In case of lower budget, company can face some problems and issues. The budget plays a big role in the company progress the company should hire the professionals to plan the budget range. The budget should be designed by keeping in view the all company needs and requirements. If the company needs more requirements, then budget should increase in the value. The professionals can do this job in a good way.



Having a budget that ensures profitability budget profit

Tuesday, 22 April 2014

Optimizing funds needed for each phase of a project

Optimization is the procurer used to make a system design as very effective as possible to make maximum use of the available resource to obtain maximum results from them. It is a very important tool in saving the project resources, especially the funds for the project which are very scarce. It makes sure that the highest results are obtained at the end of the project phases.


A good project always seeks to moderately high, long term capital appreciation with lower current income. That budget made before the financial year start, it must be able to make maximum use of the available funds, throughout the project phase. The funds for the project must be allocated well; every coin must be accounted for.


Optimization of funds ensures maximum profit is obtained, it’s because it makes sure that the input expenses are at the lowest lowering the cost. The project can be seen if it is making a loss or a profit through assessment of financial records after every project phase. By doing this the management can be able to roughly predict the expected output at the end of the year and predict if the project will make a profit or loss.


Furthermore, optimization is a very accurate method to employ if one wants to make a profit. By using mathematics skills, proposals can make and evaluated to identify which combination does best. The funds for the project are used to estimate the amount of output that will be obtained at the end of the project last phase. This accuracy only depends on the best formulation made by the managing c



ommittee.


Those using this method must be very accurate to avoid loses as a result of poor calculation. As much as the project needs to use very little funds this must be taken into consideration. The more one invests, the more output he or she gets. Other factors like proper management should remain constant so that they do not inhibit the process of investment like embezzlement, laziness and others.


The optimization plan must always be reviewed more often; any changes in the market must be made in the plan. This plan must be in the budget for easy access. The management must always refer to it in case they need to make any decision or alter any adjustments in the project. By doing this the project will fulfill its intended goals at the end of the project final phase. It is hard to keep the budget in the mind. The use of professionals is good to determine the budget range. The project needs to plan by the professionals. You can find the professionals to deal the project plans and issues in a good way. The project management is a basic tool and category for the companies and firms. The companies always offer and show the best performance to deal with company problems. The use of project management is possible with the help of professionals.



Optimizing funds needed for each phase of a project

Sampling and investigating your project site

Before you start your project on a particular construction site, there are certain things that you need to look at. You have to do some investigations of the site so as to make sure that the site is suitable for construction. Being a hurry to start on the project before investigating site problems will only lead you to many problems. The scope of this description is to enlighten on the different areas that need to be looked into while doing the investigations of the site.


Procedure


Ground water is always a common phenomenon. Before you start the construction you need to make sure that the level of the ground water is not to close to the ground. If the surface water is too close than you will take forever to complete the project and even once it is completed it will not be a very good project. Exploring site water will help prevent delays in project completion.



Managing site soil gas is also very essential before starting the construction. You have to make sure that the soil gas is not the sort of gas that will pose danger to the men who are working on the site. You need to take care to ensure that this gas is not dangers and is also not in bad quantities on the soil.


On the site you may find some items that you are not sure what they are because of their difficulty when it comes to cleaning them. You have to make sure that you get rid of these items so that you avoid any accidents. You also need to take samples of the soil for testing while exploring site before construction. This will help you know the sort of soil that you are working on and the best ways to manage the soil.


Managing site problems also requires that you deal with the moisture issues as well as water problems that are on site. Moisture and water issues have the capacity to affect the project and therefore require that you deal with them as soon as you realize that there is need to do so. For this you need to seek the help of qualified personnel to take a look at the site as they have done this many times and will have the best solutions for you.


Sometimes investigating site before construction will require that the aquatic biota be looked into. This is also very sensitive and you have to leave this for the experts.


Looking into these simple things will help to make sure that your project runs smoothly without any problems. This just goes to say that you should take these investigations very carefully. Never start the project when you have not yet done these investigations or when you find any problems with the site that you are about to do the construction. You have to make sure that the investigations are done by persons who are qualified to do the investigations so that errors are avoided.



Sampling and investigating your project site

Monday, 21 April 2014

Project Systems that work!

A project is generally a very complex, with a unique, with a high degree of risk, with precise goals, with a limited in duration, and it is cost and capacity intensive, with a subject to quality regulation and strategic importance to the company carrying out that specific project. A system site is where all the major activities of the project being undertaken will be carried out and monitored from. A project system has a life cycle, the cycles involves; definition, development, planning, budgeting, execution, evolution and closure.


Today it’s very possible to implement a system with less effort and with less cost; this is as a result of the technology. To make this technology effective it needs a combination of personnel, processes and technology to improve the project system. A successful system starts with identifying and understands in well the defined goals, carefully planning the strategy to those goals and a vision to attain the s



et goals. By introducing a strategic planning in a system site of a project, it will move the project to a new dimension and profitability.


A system that runs well enables better decision making capabilities with proper visibility. It also betters the profits and business outcome. To attain this all the objectives and goals must be defined for the project system. The system site must be visited intensely to make sure that the set goals are achieved and to see if the project system is running smoothly.


The reports must be viewed and submitted at least every month, the summary and progress can be obtained. Those workers who are under performing must be summoned. The proj


ect cannot run smoothly if some workers fail to deliver their best. Every worker must do what he/she has been assigned to do to make sure that no stone is left unturned. That project system management should even take a role call to make sure that all workers report to work and on time. Those who fail should be removed from their duties are being sacked if they fail to change.


Any project can only progress and attain its goals if its system is running smoothly and effectively. The managing personnel have a key role to play here to make sure that this is followed and achieved. The project will otherwise fail or make losses if no proper measure is undertaken by the relevant authorities. This will help to have a system that is running smoothly. In order to plan a budget, you should look for the professionals who understand and know such things in a good way. The use of best services of internet can offer you long term benefits. The site management is a source of best reward and profits. Therefore the company should hire the professionals or experts to unlock the best deals and services. The project system or management is a source of profitable deals for the guys. Hence you must take care about such matters. The project system or plan can found online.




Project Systems that work!

Sunday, 20 April 2014

Add cost to all primavera activities from excel with Vlookup

Add cost to all primavera activities from excel with Vlookup


This productivity video will teach you how to add the budget cost from Excel to Primavera using Import, Export and VLOKUP. this method will save time and efforts.


[level-premium]


[/level-premium]



Add cost to all primavera activities from excel with Vlookup

How to read primavera time schedule for Engineers and Project Manager

This video is for Site Engineers, Construction Managers, and Project Managers. How to read and understand a time schedule made by oracle primavera.


What is the time schedule?


The time schedule is a contractual document between the client and the contractor which defines the forecast sequence, progress of the work and the contractual start, finish and milestones dates.


How to read and understand Primavera Time Schedule


Primavera Time Schedule Layout usually contains 2 main sections, Bar chart and activity list. to understand the time schedule accurate and fast you should


A-READ THE COLORS FIRST


B-READ THE DATA


Watch the following video


 



How to read primavera time schedule for Engineers and Project Manager

How to add and assign resources in Primavera P6

How to add and assign resources in Primavera P6


It is explained step by step in this video, how to add the resources and how to assign the resources to all the activities in seconds.


[level-premium]


[/level-premium]



How to add and assign resources in Primavera P6

How to convert a Primavera P3 Plan into Primavera P6

How to convert a Primavera P3 Plan into Primavera P6


Sometimes we need to convert a Primavera P3 plan into Primavera P6. All the procedure is explained step by step.


[level-premium]


[/level-premium]



How to convert a Primavera P3 Plan into Primavera P6

How to copy a project from one EPS to other

How to copy a project from one EPS to other


It is explained in this video how to copy a program with or without baseline, cost or relationships etc from one EPS to another.


[level-premium]


[/level-premium]



How to copy a project from one EPS to other

How to make Layouts in Primavera P6

How to make Layouts in Primavera P6


Layout are made to have the same settings for print option, time scale, display etc. It is explained in this video how to make and save different layouts.


[level-premium]


[/level-premium]



How to make Layouts in Primavera P6

What is the purpose of claim digger in Primavera P6

What is the purpose of claim digger in Primavera P6


When you need to compare two Program i.e updated program and baseline program, or program rev 01 and program rev 02. Claim digger will give you all the differences report.


[level-premium]


[/level-premium]



What is the purpose of claim digger in Primavera P6

How to use fill down & its purpose in Primavera P6

How to use fill down & its purpose in Primavera P6


Fill down is the best option when you need to copy the same value to underlying activties. It is explaned with different examples in this video.


[level-premium]


[/level-premium]



How to use fill down & its purpose in Primavera P6

How to modify a baseline program in Primavera P6

How to modify a baseline program in Primavera P6


Sometimes you need some modification in your baseline program which is assigned to your current updated program. You can not modify it while working in the current program. Completed procedure is explained in this video how to modify a baseline program in Primavera P6


[level-premium]


[/level-premium]



How to modify a baseline program in Primavera P6

Planning EngineerPlanning Engineer