Wednesday, 30 April 2014

Avoiding death and accidents on site

Over the past years, it has not been new news to hear about worker deaths on construction sites. The sad part about all this is that these deaths could have been avoided if the project managers had some knowledge on ways of avoiding deaths while on site. The aim of this description is to make sure that the deaths on the site are reduced and if possible avoided completely.


Procedure


Prevention is always better than cure. Site workers need to have protective gear even as they are working. The protective gear will help the workers not get injured so much in the event of accidents. On site deaths can be very devastating to the workers and will have a very negative impact on your reputation and so you have to avoid this at all cost.



Scaffoldings are some of the most common causes of accidents at the site and can lead to death depending on the impact. Scaffolding should always be done with persons who are skilled and qualified in that area. The workers on the site should not be left to do the scaffolding. If death occurs due to poor scaffolding, coping death can be very hard for the workers as they will feel very guilty.


Worker deaths can also be avoided if the site is lit well. You have to make sure that the site workers are working in the proper lighting at all times to avoid slips and falls. It is very dangerous if the lighting is poor because accidents that could be avoided may be hard to avoid. The lighting should be just right. It should not be too bright neither should it be dim.


The site workers also need to make sure that they take measures to protect themselves from accidents. Some of the on site deaths can be avoided if the site workers also take responsibility for their safety. Behaviors such as using the phone while driving or driving aggressively are some of the common behaviors of the site workers that need to be avoid. The site workers also have to make sure that they do not work under the influence of drugs or alcohol.


The project managers have to make sure that they abode by the construction regulations at all times. These regulations are there to protect the workers from accidents and even death. Abiding by these regulations will help reduce and even prevent the site deaths. Death can also delay the project especially if it is due to negligence from the project managers.


Safety equipment needs to be in the right condition and they need to be regularly checked. This will help prevent site deaths by a large percentage. The site workers also need to be informed of how to use the safety equipments. This is very essential and should never be taken for granted. The project team does not need to thing about maters of coping death or death on the site if these simple things are followed.




Avoiding death and accidents on site

Monday, 28 April 2014

DEALING WITH DISHONEST AND LAZY WORKERS

The prosperity of any project lies in the amount of input one puts in, it maybe capital, labor and time. These three factors are so crucial; in this section shall show various factors inhibiting maximum project labor input especially dishonesty and laziness among workers. Training workers process and procedure shall also be dealt with.


It’s said prevention is better than cure, before employing a worker check his or her backgrounds thoroughly this will help you avoid dishonest workers. Of course one or two may make without their earlier dishonesty/ laziness uncovered, due to his/her smartness.


In case you finding a suspected dishonest worker in your company, get proof of his/her dishonesty. Never blindly believe your workers word, find enough proof to avoid putting the company at risk or punishing the worker who could be innocent.


Training workers is very important step in avoiding lazy workers. Well trained personnel never fails to give the best, to some extend it helps in reducing chances of employing a dishonest worker. It’s because training equips one with skill and knowledge to carry out the project labor demands. He knows when, how, why and what to do the recommended work.


The workers past must be reviewed and a thorough background check must be taken. Get evidence from the former employer if need be. Confront the dishonest worker after you have proven his dishonesty or laziness. Impose consequences on the worker if he or she cheated on her background, use the evidence you collected to make the dishonest worker see her fault.


If the worker is too lazy he must be monitored, never give him a chance to continue with his/her laziness. It’s through monitoring that this vice won’t spread to other workers; this will make th



e project labor demand is always met. The management should not put two lazy workers on the same working group. Those who are lazy must be put at a place they can be seen easily.


The company must employ workers from a reputable training workers institute, the training is very important. The project labor doesn’t only need quantity but quality input. For quality input there must be proper training.


The world keep changing all the time, the same ideas can’t be used over and over again. The company must always make sure that the process of training workers continue; through seminars, attending exhibitions and tours. It seems hard to deal with lazy workers due to many issues and problems. Some people consider it simple to fix such problems. The use of paid services of working is best. In order to deal with workers, one can introduce new offers and techniques. The training is crucial and mandatory for workers in the world. It makes the workers able to offer best performance and services in the company. Hence most of companies wish to use such company services. Now various types of training programs are available for the benefit of workers and employers in the whole world.



DEALING WITH DISHONEST AND LAZY WORKERS

Delivering projects on record time

For one to succeed as a Project Manager Personnel, he/she needs to deliver projects on time and within budget requirements. But project delivery on time is not as easy as it sounds in most cases. Many fail in timely delivery of their projects. So how can one put processes in place to help him to deliver the projects on schedule? Here are some suggestions and by following some simple steps.


The managing delivery group must calculate the time spent undertaking all the tasks in a project. The task undertaken must be identified and the cost which involves the control of the level of recourse allocated to tasks. The group must monitor the completion of the tasks and identify the outstanding work needed to finish a task before project delivery.This will make good use of the available time, which is precious.


The document time sheet must be put in place to ensure timely delivery of the project. Every worker must provide his/her worksheet and it must be accurate. They shouldn’t wait till the end of the project to start preparing. The managing delivery personnel must receive the workers worksheets on a weekly basis. This will make the process of project delivery quick and easy. Besides, the report will be accurate because no information will be left out.


The project reports must always be updated all the time by the managing delivery personnel, especially on the progress, work done and what to be done. He/she must be notified in



case there is a request for assistance, change in personnel allocation and in case more time for the project delivery need to be extended due to delays and in case of an emergency.


Timely delivery of any report is so important for the health of any project, the progress made can be seen. It also shows how the managing delivery team is effective. Many projects


couldn’t be failing in case the managing team is to the par and its giving all the best to make sure that the running of the project is smooth.


Any Project to be done needs inceptions and preliminary planning’s need thoughtful definition of goals and needs, master plan to accommodate anticipated future requirements, to evaluate project alternatives, identify site requirements, funding needs, budget authorization cycles of the project, and lastly the phasing of the project. This role must be played by the managing personnel.


Each project needs some requirements and skills to resolve the business problems in a better way. The fast and timely delivery of good and products is very important for the company reputation. In case of no or late delivery, the company can face some problems. Hence, the company owners always try to deliver the projects on time. The managing delivery service is not very simple instead; it requires more skills and energy. The use of training program is best for the sake of workers and staff. The company owners like to offer the free training to their workers to have best features.



Delivering projects on record time

Sunday, 27 April 2014

Environmental hazards capable of militating against your projects

There are times when no matter how much you try to avoid hazards they just seem to happen. This can be very frustrating especially of the hazards are caused by things that are under your control. Environmental hazards are these sorts of hazards that you most certainly cannot avoid but you can try and protect yourself from these hazards. The scope of this description is to make sure that you are aware of the different problems that can be due to natural issues and the best ways to protect yourself against these problems.


Procedure


Fire hazards are an example of fires than can come about because of natural conditions such as a heat wave. The best way that you can protect yourself against such a hazard is by making sure that you always have a fire extinguisher with you at all times. This needs to be strategically placed on the construction site. You also need to make sure that you always have the contacts of a good fire extinguisher company. In this case you will be able to reduce fire accidents that can lead to project failure.




Heavy rains are also a very common culprit to project failure. When there is a very heavy downpour and you have not yet well secured the constrictions then there can be falls. These can lead to a lot of accidents on the construction site. One of the beast ways that you can avert this problem is to try as much as possible to make sure that you do the project when the weather is favorable. Though the weather can be unpredictable it is always good to be on the safe side than to be sorry.


Toxic chemicals are also natural issues that have the potential to affect the project that you are working on tremendously. This is the sort of hazard that can be averted by making sure that you have done sufficient inspection of the soil and the area that you are working on before starting the construction. There are instances where accidents have happened because people inhaled toxic chemicals such as sodium hydroxide from the construction site. When this happens on your site you might be held responsible even though it was not your fault that this happened.


Environmental hazards need to be looked into while assessing the risks of the project. This is simply because of the fact that these hazards have the potential to have a very bad impact on the workers’ health directly or indirectly. You as the project manager are charged with the responsibility of making sure that the site workers are always very well taken care of. You therefore have to make sure that the environmental issues that may arise are very well taken care of by taking all the necessary precautions to prevent these issues from taking place. There are so many issues that may arise and these are just some of the issues that may arise that need to be taken into consideration.



Environmental hazards capable of militating against your projects

Friday, 25 April 2014

Monitoring and Controling Excel Sheet, From Primavera to Excel by one click!

The must have Excel sheet for every Planning Engineer, Project Manager, Construction Manager, and whoever is involved in monitoring and controlling projects. I created this Excel sheet from my best practices working as Planning Manager during my 11 years experiences. Do the scheduling in Primavera, and the Reporting, Monitoring, and Controlling in Excel. or even do both in ECXEL!


Watch the following videos for more information about monitoring and controlling excel sheet:


 
Check out how to convert a primavera schedule to the excel sheet format in minutes:




Calculate the Planned values, Planned %, and Planned Quantities Automatically.

  • Create Bar chart, Histograms, Monitoring Sheets, Productivity Sheets Automatically.

  • No need to retype or create new schedule, copy from Primavera directly to the Excel.

  • Free Update for 1 Year. I am continually adding features to this sheet, All the updates will be send to you for a whole year!.

  • Do professional reports, and Monitor your projects effectively.

  • Free Support for 1 Year.

Note: All new tutorials, learning materials, and New versions of the sheet will be sent by Email to the buyers and i will update it here ass well.





Monitoring and Controling Excel Sheet, From Primavera to Excel by one click!

First Aid and injuries on site

The site is not always the best place to be. Accidents are prone to happen and site injury is always quite common. Some of the project injuries can be avoided and if not first aid measures can be taken immediately so as to avoid deaths or worsening of the conditions. The scope of this description is to enlighten the project managers on some of the accidents that can occur on site and the possible ways on managing the injuries.


Procedure


Bruises and fractures can happen and will happen from time to time to the site members. These are not very dangerous accidents and can be managed with simple first aid on site measures. The person that has been bruised or had a fractured is to rest for some time. The place can then be iced and compressed then elevated. This will take just a few minutes and the person can get back to work in a short time.



Electrical injuries are also very common site injuries. These can be cause by poor installation or shocks as the installation is taking place. The first thing you need to do is to make sure that you don’t move the person or touch them. You then need to call the hospital if the shock was due to a high voltage and the person does not come to.


Dislocations and repetitive stress injuries are also injuries that can need to be given some first aid on site treatment when they occur so that they don’t become very severe. Repetitive stress injuries are mostly due to repeated actions. These can be avoided if the site workers change their motions from time to time.


Some site injuries are usually very simple to resolve but others require that you do some CPR to the injured person. CPR is very simple but you have to make sure that you call 911 even before you decide to do the procedure. You then need to check if the person is breathing or if they are having difficulties breathing. After you have done this you have to do some chest compressions and check on the worker who has been hurt. If this does not work you then have to do mouth to mouth resuscitation. Altitude sickness is an example of injury that may require such attention.


Cuts are scrapes are also common project injuries that can be happen as the workers are doing the construction. For these you need to make sure that you have a first aid kit with swabs ready for doing some first aid. The injured worker needs to first of all make sure that they stop what they are doing. They then need to look for a disinfectant and disinfect the cut or scrape. If the cut is too deep and done with a blunt and rusty thing then the person will need tetanus shot. You as the project manager need to make sure that you take the responsibility of paying the bills of the injured workers.



First Aid and injuries on site

Exploring the best approach to achieving tasks

If you want a project to be a success, then you have to make sure that you are aware of the best ways to handle and manage the tasks of the project. A project has to have tasks that need to be performed and results produced for it to become a success. The scope of this procedure is to ensure that the tasks are running as they should so that the project can be a success. It is a guide to help in ensuring that results are achieved from the different tasks performed.


Procedure


Failure to plan is planning to fail. A project needs to have very good planning for it to become a success. The plan needs to be drafted very well and the tasks need to be defined and a timeline set for achieving the tasks. You also have to make sure that you have the right number of personnel task achievement.



Good project management also requires that you come up with a system where you can be able to get feedback from the site workers. You need to have a way of knowing the progress of the project and how the tasks are being performed. There is also need to check the problems that have been encountered and the possible ways of dealing with these problems.


When faced with the challenge of limited resources, the project manager needs to look for the best approach to manage the limited resources. The resources need to be directed with the projects that are most important and then the rest of the resources can be managed on the other resources.


Before you start the different tasks it is also very important that the risks of the different tasks be looked into. There is no need of starting a task and then start to panic when you face these risks.


The goal of the project needs to be defined very clearly. This will help in coming up with the right tasks that will help in achieving these goals. You have to make sure that the objectives are also well drafted and that the tasks that you come up with are in line with the tasks that you have outlined. This will help in making sure that task achievement is possible.


Motivating the workers is also a top best approach in achieving tasks. The workers need to be happy when they are working on the project if you want to get results. You can look for the different ways of making the workers motivated from time to time.


Proper project management that will lead to achieving the tasks also requires that you recognize that the workers require some rest. You should never strain the workers in any way so that you can achieve the tasks. This will lead to task achievement but the task achievement will not be done in the right manner. The overall end product of the project will be of a very poor quality. Always make sure that the working timeline is a reasonable one.



Exploring the best approach to achieving tasks

Thursday, 24 April 2014

Having a budget that ensures profitability budget profit

Budgeting is a crucial stage in any business project; all the steps of budgeting must be followedin the later to make sure that an ideal budget is created.  The annual budgeting process must be well documented, with duties, duty assignments and deadlines clearly outlined. The managing committee must be set up to be involved in managing project tasks. The head of the group must be appointed and all the relevant leaders to spearhead the project activities and to fasten decision making.


After the project has been created the ideas must be put to use through project managing activities. The organization must create a surplus budget that will maximize the use of the available input and maximize the project profit. All the expenses must be included in the budget to avoid unplanned usage of the project resource.


Managing project processes involve assessing the progress of the project to check if it’s making a profit or a loss. An effective project budget must be able to cater for the changes in ma



rket trends by allocating resources for that. The spreadsheet is an important tool for any budget those managing the project must learn to know how to use a spreadsheet. The spreadsheet is so important because it will show a full report and a summary of the project process. If the project profit is deprecated or appreciating it will be seen in the trend of the project progress.


The act of taking responsibility is very important in any project; the project managing group during the managing project process allocates every member with duties to do. The group must assign the personnel well, those who under achieving their set goal can be noted and a correct measure of correction can be taken. It’s through this will be able to identify the channel of losses, hence maximizing project profit made by the project.


The budget must be reviewed more often, to make sure that no single step in the budget is left out throughout the project financial time. It this is not done the project goals will be jeopardized, funds will be used for the wrong purpose and even embezzled by the managing committee. As a result of this the managing project committee would have failed this will make the project to fail too. By doing all these the project profit goal will be attained, if it fails, there is another chance for improvement.  The budget is very important for a company or firm in the world. It is important to fulfill the needs of company within present budget range. In case of lower budget, company can face some problems and issues. The budget plays a big role in the company progress the company should hire the professionals to plan the budget range. The budget should be designed by keeping in view the all company needs and requirements. If the company needs more requirements, then budget should increase in the value. The professionals can do this job in a good way.



Having a budget that ensures profitability budget profit

Tuesday, 22 April 2014

Optimizing funds needed for each phase of a project

Optimization is the procurer used to make a system design as very effective as possible to make maximum use of the available resource to obtain maximum results from them. It is a very important tool in saving the project resources, especially the funds for the project which are very scarce. It makes sure that the highest results are obtained at the end of the project phases.


A good project always seeks to moderately high, long term capital appreciation with lower current income. That budget made before the financial year start, it must be able to make maximum use of the available funds, throughout the project phase. The funds for the project must be allocated well; every coin must be accounted for.


Optimization of funds ensures maximum profit is obtained, it’s because it makes sure that the input expenses are at the lowest lowering the cost. The project can be seen if it is making a loss or a profit through assessment of financial records after every project phase. By doing this the management can be able to roughly predict the expected output at the end of the year and predict if the project will make a profit or loss.


Furthermore, optimization is a very accurate method to employ if one wants to make a profit. By using mathematics skills, proposals can make and evaluated to identify which combination does best. The funds for the project are used to estimate the amount of output that will be obtained at the end of the project last phase. This accuracy only depends on the best formulation made by the managing c



ommittee.


Those using this method must be very accurate to avoid loses as a result of poor calculation. As much as the project needs to use very little funds this must be taken into consideration. The more one invests, the more output he or she gets. Other factors like proper management should remain constant so that they do not inhibit the process of investment like embezzlement, laziness and others.


The optimization plan must always be reviewed more often; any changes in the market must be made in the plan. This plan must be in the budget for easy access. The management must always refer to it in case they need to make any decision or alter any adjustments in the project. By doing this the project will fulfill its intended goals at the end of the project final phase. It is hard to keep the budget in the mind. The use of professionals is good to determine the budget range. The project needs to plan by the professionals. You can find the professionals to deal the project plans and issues in a good way. The project management is a basic tool and category for the companies and firms. The companies always offer and show the best performance to deal with company problems. The use of project management is possible with the help of professionals.



Optimizing funds needed for each phase of a project

Sampling and investigating your project site

Before you start your project on a particular construction site, there are certain things that you need to look at. You have to do some investigations of the site so as to make sure that the site is suitable for construction. Being a hurry to start on the project before investigating site problems will only lead you to many problems. The scope of this description is to enlighten on the different areas that need to be looked into while doing the investigations of the site.


Procedure


Ground water is always a common phenomenon. Before you start the construction you need to make sure that the level of the ground water is not to close to the ground. If the surface water is too close than you will take forever to complete the project and even once it is completed it will not be a very good project. Exploring site water will help prevent delays in project completion.



Managing site soil gas is also very essential before starting the construction. You have to make sure that the soil gas is not the sort of gas that will pose danger to the men who are working on the site. You need to take care to ensure that this gas is not dangers and is also not in bad quantities on the soil.


On the site you may find some items that you are not sure what they are because of their difficulty when it comes to cleaning them. You have to make sure that you get rid of these items so that you avoid any accidents. You also need to take samples of the soil for testing while exploring site before construction. This will help you know the sort of soil that you are working on and the best ways to manage the soil.


Managing site problems also requires that you deal with the moisture issues as well as water problems that are on site. Moisture and water issues have the capacity to affect the project and therefore require that you deal with them as soon as you realize that there is need to do so. For this you need to seek the help of qualified personnel to take a look at the site as they have done this many times and will have the best solutions for you.


Sometimes investigating site before construction will require that the aquatic biota be looked into. This is also very sensitive and you have to leave this for the experts.


Looking into these simple things will help to make sure that your project runs smoothly without any problems. This just goes to say that you should take these investigations very carefully. Never start the project when you have not yet done these investigations or when you find any problems with the site that you are about to do the construction. You have to make sure that the investigations are done by persons who are qualified to do the investigations so that errors are avoided.



Sampling and investigating your project site

Monday, 21 April 2014

Project Systems that work!

A project is generally a very complex, with a unique, with a high degree of risk, with precise goals, with a limited in duration, and it is cost and capacity intensive, with a subject to quality regulation and strategic importance to the company carrying out that specific project. A system site is where all the major activities of the project being undertaken will be carried out and monitored from. A project system has a life cycle, the cycles involves; definition, development, planning, budgeting, execution, evolution and closure.


Today it’s very possible to implement a system with less effort and with less cost; this is as a result of the technology. To make this technology effective it needs a combination of personnel, processes and technology to improve the project system. A successful system starts with identifying and understands in well the defined goals, carefully planning the strategy to those goals and a vision to attain the s



et goals. By introducing a strategic planning in a system site of a project, it will move the project to a new dimension and profitability.


A system that runs well enables better decision making capabilities with proper visibility. It also betters the profits and business outcome. To attain this all the objectives and goals must be defined for the project system. The system site must be visited intensely to make sure that the set goals are achieved and to see if the project system is running smoothly.


The reports must be viewed and submitted at least every month, the summary and progress can be obtained. Those workers who are under performing must be summoned. The proj


ect cannot run smoothly if some workers fail to deliver their best. Every worker must do what he/she has been assigned to do to make sure that no stone is left unturned. That project system management should even take a role call to make sure that all workers report to work and on time. Those who fail should be removed from their duties are being sacked if they fail to change.


Any project can only progress and attain its goals if its system is running smoothly and effectively. The managing personnel have a key role to play here to make sure that this is followed and achieved. The project will otherwise fail or make losses if no proper measure is undertaken by the relevant authorities. This will help to have a system that is running smoothly. In order to plan a budget, you should look for the professionals who understand and know such things in a good way. The use of best services of internet can offer you long term benefits. The site management is a source of best reward and profits. Therefore the company should hire the professionals or experts to unlock the best deals and services. The project system or management is a source of profitable deals for the guys. Hence you must take care about such matters. The project system or plan can found online.




Project Systems that work!

Sunday, 20 April 2014

Add cost to all primavera activities from excel with Vlookup

Add cost to all primavera activities from excel with Vlookup


This productivity video will teach you how to add the budget cost from Excel to Primavera using Import, Export and VLOKUP. this method will save time and efforts.


[level-premium]


[/level-premium]



Add cost to all primavera activities from excel with Vlookup

How to read primavera time schedule for Engineers and Project Manager

This video is for Site Engineers, Construction Managers, and Project Managers. How to read and understand a time schedule made by oracle primavera.


What is the time schedule?


The time schedule is a contractual document between the client and the contractor which defines the forecast sequence, progress of the work and the contractual start, finish and milestones dates.


How to read and understand Primavera Time Schedule


Primavera Time Schedule Layout usually contains 2 main sections, Bar chart and activity list. to understand the time schedule accurate and fast you should


A-READ THE COLORS FIRST


B-READ THE DATA


Watch the following video


 



How to read primavera time schedule for Engineers and Project Manager

How to add and assign resources in Primavera P6

How to add and assign resources in Primavera P6


It is explained step by step in this video, how to add the resources and how to assign the resources to all the activities in seconds.


[level-premium]


[/level-premium]



How to add and assign resources in Primavera P6

How to convert a Primavera P3 Plan into Primavera P6

How to convert a Primavera P3 Plan into Primavera P6


Sometimes we need to convert a Primavera P3 plan into Primavera P6. All the procedure is explained step by step.


[level-premium]


[/level-premium]



How to convert a Primavera P3 Plan into Primavera P6

How to copy a project from one EPS to other

How to copy a project from one EPS to other


It is explained in this video how to copy a program with or without baseline, cost or relationships etc from one EPS to another.


[level-premium]


[/level-premium]



How to copy a project from one EPS to other

How to make Layouts in Primavera P6

How to make Layouts in Primavera P6


Layout are made to have the same settings for print option, time scale, display etc. It is explained in this video how to make and save different layouts.


[level-premium]


[/level-premium]



How to make Layouts in Primavera P6

What is the purpose of claim digger in Primavera P6

What is the purpose of claim digger in Primavera P6


When you need to compare two Program i.e updated program and baseline program, or program rev 01 and program rev 02. Claim digger will give you all the differences report.


[level-premium]


[/level-premium]



What is the purpose of claim digger in Primavera P6

How to use fill down & its purpose in Primavera P6

How to use fill down & its purpose in Primavera P6


Fill down is the best option when you need to copy the same value to underlying activties. It is explaned with different examples in this video.


[level-premium]


[/level-premium]



How to use fill down & its purpose in Primavera P6

How to modify a baseline program in Primavera P6

How to modify a baseline program in Primavera P6


Sometimes you need some modification in your baseline program which is assigned to your current updated program. You can not modify it while working in the current program. Completed procedure is explained in this video how to modify a baseline program in Primavera P6


[level-premium]


[/level-premium]



How to modify a baseline program in Primavera P6

Saturday, 19 April 2014

Creating a conducive environment for efficiency on sites

The goal of every successful employer in the construction business, besides making sure that the workers get to do their job under optimal conditions, is to create a better environment, which makes the workers’s effort more efficient and furthermore – profitable! Creating a rich and powerful environment in construction business is a growing concern of many employers, and they do have a lot of obstacles in their way. These are actually common issues that get in the way of productivity, and most commonly, the issues are closely related to the employer – employee relations, poor safety measures, failure to adapt to more advanced methods and tehniques or increasingly low salaries. Construction efficiency is what makes the business thrive, without it, hardly anything can be done properly. For example, if a worker hasn’t been provided with functional equipment and he suffers an injury as a consequence, he will become increasingly stressed out at his workplace.


No one can perform well under stress, and this ruins the overall performance and quality of projects. You can do a lot of things to reduce the level of stress of your workers by in



creasing safety measures. Besides the rather simple equipment safety checks, one should also keep in mind that environment safety is just as important. With the numerous risks on the site, project management safety is obligatory. A number of things can go wrong just because the construction site wasn’t inspected and properly maintained. Toxic chemical spills, and dangers of electrocution, just to name a few. Accidents of this sort bring devastating damage to the site and, not to mention workers involved. Furthermore, a chemical spill endangers the health of the surrounding areas, so many more issues can arise from a careless mistake. These accidents endanger the project management
safety .These are all the issues that hinder productivity. The best way to go around them is to administer advanced environment safety measures and preach awareness into the minds of your workers. Just by doing so, you decrease the chances of anything bad happening at the site, and your workers will work undistracted by fears.


Show your concern for your workers, speak to them sometimes, they will see you as a friendly figure and your realtionship will increase. Treat them equally and you will avoid the possibility of them fighting among themselves. Only when you have taken these steps, you will achieve the construction efficiency. You will get to see how brilliantly they can work when they are united. The best of all is the fact that these are some minor, lesser things that you can easily resolve. And just by doing so, you will remove all of the obstacles out of the way and create a productive, healthy working environment which will reflect on your earnings. Safety of workers is very important on working sites and projects because it affects on company reputaion and fame. Therefore company owners love to take care of their workers and labor to establish good environment



Creating a conducive environment for efficiency on sites

Weather and Environmental factors

 


The scope of the procedure here is to ensure that weather issues in no way interfere with the construction work. Projects can be affected very negatively by weather damages and so one has to make sure that all these aspects are put into consideration so as to avoid such damages that will end up delaying the construction.



  1. Procedure


Before coming up with the final project plan you need to sit down with your client and look at the weather and the effects it is going to have on the project. You do not want to build a house in the snow or in a blizzard where the engineers will have to seek shelter from time to time. This will only delay the project. Make sure that you look for a time frame that will be conducive so as to avoid weather damages. Bad weather can cause your equipments to malfunction as well and this will mean that your initial budget will have to change.


Even if you are doing a local construction, you need to make sure that you abide with the environmental standards of the said country. Each and every country may have their own regulations when it comes too matters concerning the environment and project implementation. Abiding by the rules and regulations of the environment will help you get out of a lot of trouble and will also make sure that your project runs smoothly.


The success of the final project will also be dependent on weather issues in the sense that the weather may affect the health of the people working in the project. You do not want to have to replace your workers every time because they are sick and you could have avoided it. Weather dangers such as slipping and falling because of rain water can also bring you as the project manager into a lot of trouble because you did not take measures o protect your workers.


Always make sure that you know the society norms as well if you want your project to run smoothly. You have to make sure that you do not go against these norms. This means that you will have to do some background checks on the specific society paying special attention on matters of pollution. You have to make sure that the environment and project you are working on are on the same page.


Not paying attention to the weather issues will delay the time that the project would have taken to complete and at the same time lead to additional costs and so you should never ignore the weather. Taking into consideration the weather will help prevent any perceived weather dangers and this will give you peace of mind even after the project is completed. So as an engineer these are some of the things that may look so little but should never be ignored. Weather is unpredictable but you have to make sure that you have tried your best to choose the time that the weather will be most favorable.




Weather and Environmental factors

Friday, 18 April 2014

Starting up a project

Starting a project is one of the hardest things to do if you do not have the right information or lack the experience. It needs one to have good project management skills for it to be a success. The start of the project will predict the progress and the end of the project and so you have to make sure that your start is well done. This procedure aims to help you start up your project smoothly and proceed with the project with fewer frustrations.


Procedure


Every project needs to have a plan. The plan has to entail how the project will be carried out as well at the resources that are required for the project to be carried out. You need to have a date when the project will start and when the project will end in this plan as well. The plan has to be very comprehensive detailing the roles of the people who are going to be involved in the project. It needs to outline the project management team members’ roles and what they are expected to earn as well. The budget in the plan needs to be very well done and stated in the plan.



A worksheet is very important when you are starting a project. It will help everyone know what the project is all about in a very simple way. It will also help ensure that the team members know what they are supposed to do and by when they are supposed to do it. Starting a project can be hectic and confusing for the team members if they are unaware of exactly what they are supposed to do.


As you are making the plan for the project, you have to bear in mind the possible risks that you are likely to encounter. Risks can occur at anytime and so you have to be prepared and know exactly how you are supposed to bounce back from the risks. You need to have project management skills that will enable you know what to do in the event of perceived risks in the project. You have to know what to do in the event of unforeseen accidents or poor weather.


Having adequate resources for a project is one of the most important things to ensuring a successful project. There is no need for you to start a project that you are sure you may not be able to finish due to financial constrains. You have to make sure that you have just the enough resources for the project even before you start the project. These can include equipment and staff just to mention a few. If the resources are not enough then you need to make sure that what you have is something that can be managed in such a way that it will not compromise on the quality of work that you are going to do.


Project management at the start of the project requires that you remain calm and composed failure to which it will lead to a lot of frustrations.



Starting up a project

Hire Me! 30 Minutes

Do you have any questions about Project Management, Primavera, or Microsoft Excel?


Do you like to learn about a specific subject?


 


I am a professional Planning Manager with 11 years of experiences with large scale, and international projects.


What i can do for you?


I will create a private chatting room between me and you only, both of us will be able to communicate with voice, and we can share the screen as well. the following is a list of the items i can help with.


1- Teach you anything in Primavera.


2- Create a schedule for you, or watch me doing a schedule in primavera.


3- Teach you anything in Excel.


4- create any Excel template for you.


5- Review your Time Schedule, and give you Recommendations.


6- Teach you the concept of project management.


7- Teach you how professional companies deal with planning ?


8- Teach you the planning engineer jobs and responsibilities.


9- ANYTHING ELSE YOU MAY ASK FOR RELATED TO PROJECT MANAGEMENT.


How it works?


This service is per 30 minutes (half hour), so if you need one hour, you need to order the service twice, or simply change the quantity during the checkout to 2.


1- Buy the service.


2- send me a list of your inquires to prepare the answer for it.


3- Me and you agree about the timing.


4- I will send you a link to the private class with a Pre-scheduled duration as you purchased (30 minutes, 60 minutes,…etc.)


5- we meet online to discuss your quires.


6- I will send you a link to download the private session after we finish for your reference.


 


You are welcome to contact me before purchasing this service to confirm how many unites (30 minutes) we need to answer all your questions.


My Email: Info@planningengineer.net



Hire Me! 30 Minutes

Thursday, 17 April 2014

Project Planning Case Study 20 Pages Template

 


This is a Project Management Template to plan a project from A to Z according to Project Management Institute PMI planning process groups. This 20 pages Case Study contains the following analysis of project management plan:



table of content 1


table of content 2


 



 


This is in additional to Excel Templates to do the following charts:


Excel Resource HistogramOrganization ChartProject BudgetProject Cash flowqualitative risk analysis


 


 


 


 Download the Case Study


[level-premium]


Click Here


[/level-premium]



Project Planning Case Study 20 Pages Template

How to make S-curve without cost or resources in Primavera P6

How to make S-curve without cost or resources in Primavera P6


We usually make the S-curve or histogram of cost or resources to anaylise our project. If you don’t have both, no need to worry. It is explained how to make S-curve or histogram without cost or resources in this video.


[level-premium]


[/level-premium]


 



How to make S-curve without cost or resources in Primavera P6

How to make look ahead plans in Primavera P6

How to make look ahead plans in Primavera P6


You need look ahead plans to give the targets to execution team. Mostly planners do this in MS Excel. You can make look ahead plans in Primavera P6. It is explained with different examples in this video.


[level-premium]


[/level-premium]


 


 



How to make look ahead plans in Primavera P6

How to make global changes in Primavera P6

How to make global changes in Primavera P6.


Sometimes we want to apply the same rule to all the activties, so it is a laborious work to do the same with all the activties. You can do the same with help of global changes in seconds.


 



How to make global changes in Primavera P6

How to make activity codes and their importance in Primavera P6.

How to make activity codes and their importance in Primavera P6.


Activity codes are made to organise a project in a more better way. It is explained with the examples how activity codes are added, assign to the activties in seconds and what is their benefit in primavera P6.


[level-premium]


[/level-premium]



How to make activity codes and their importance in Primavera P6.

How to export a program with baseline in Primavera P6.

How to export a program with baseline in Primavera P6.


Current program with assigned baseline can not be exported together. Complete procedure is explained how to export a current program and assigned baseline in this video.


[level-premium]


[/level-premium]



How to export a program with baseline in Primavera P6.

How to export and import Primavera P6 plan into MS Excel

How to export and import Primavera P6 plan into MS Excel


It is easy to work in excel if u have activities in thousands. It is explained with all the steps how to export a Primavera P6 plan into MS Excel and after working import back into Primavera P6.


[level-premium]


[/level-premium]



How to export and import Primavera P6 plan into MS Excel

How to define and make activities Critical in Primavera P6.

How to define and make activities Critical in Primavera P6.


Usually all the planners think that activities having the float equal or less than zero are called as Critical activities. But you can define your own criteria for critical activities in the Primavera P6. Further how to make activities critical without changing their links is explained with examples in this video.


[level-premium]


[/level-premium]


 



How to define and make activities Critical in Primavera P6.

How to change a calendar after making a schedule in Primavera P6.

How to change a calendar after making a schedule in Primavera P6.


It is well explained in this video, how to change a calendar after making the schedule. You can change calendar in one WBS, selected WBS or all WBS in seconds.


[level-premium]


[/level-premium]



How to change a calendar after making a schedule in Primavera P6.

How to calculate Manpower, its S-curve and Histogram in Primavera P6.

How to calculate Manpower, its S-curve and Histogram in Primavera P6.


Whole procedure is explained in this video, how to calculate the Manpower from standard Manhours, how to do working of MH in excel and import back to P6. How to make S-curve and histogram for all or single resource.


[level-premium]


[level-premium]



How to calculate Manpower, its S-curve and Histogram in Primavera P6.

Wednesday, 16 April 2014

Quality Surveying: The right amount of materials needed on your project site

A quality surveyor is one of the most important persons that you need to have contacts of when working on a project. They will make sure that the project is running as per the initial plan by looking at what the project needs. The scope of this procedure is to help make sure the project managers understand the importance of having a quality surveyor so as to ensure project quality. A quality surveyor will help to put your worries at ease by maintaining the quality of the project.


Procedure


Planning for the project cost is not a very simple affair. It needs some hard work and dedication. A surveyor will help do all the cost planning for you when you give them a chance and so you need to seek their services especially when it comes to material survey cost planning. They will make sure that the work of planning for the materials is done for you and so you will have little to worry about when it comes to this.



They will also look into risk management. They will help to make sure that the project quality is maintained by looking to make sure that you are risk free. They will be able to check if you are about to put yourself at risk or not. You need to make sure that you give them the trust that they deserve and you can sit back, relax and let them do what they have to do.


They are very knowledgeable and they will also offer tips of procurement of materials for the project. This will make it easy for you to get the materials after you have done the material survey. Some procurement officers can be very hard to deal with and you can be sure that a good quality surveyor will make it easy for you to get the materials.


Quality surveyors are also very important in helping you to resolve disputes. They will make sure that you do not have problems with the suppliers of the materials. They will help make sure that the project runs smoothly which will be beneficial to the overall impact of the project. The quality surveyor will be the one in charge of the materials and all you have to do is give them the chance to show their worth.


One very important thing that you have to know is that there are some surveyors who are not very qualified at what they do and their aim is to get money. You need to make sure that the surveyor you are going to select is one that is qualified and knows what it is that they are doing. Once you have done this you then need to draft and contract and negotiate the terms of the contract. There is no need for you to rush into looking for a surveyor and end up getting one that is not qualified and does not know what they are doing.



Quality Surveying: The right amount of materials needed on your project site

Planning Engineering projects

Project management is not quite as simple as most people tend to think it is. It requires a lot of hard work and dedication to the job. The scope of this description is to give one an overview of what they need to put into consideration when planning a project. It will help make sure that the project is a success.


Procedure


Set clear objectives about the project. You need to bear in mind that project planning is not just a simple affair you need to be sure about what you want by first setting the right objectives. These need to outline the time frame as well. You first of all need to do a background check and make sure that you have all the information that you need including the perceived difficulties to accomplishing the task.


After you have come up with the objectives, you need to come up with the specific tasks that need to be done so as to achieve the set objectives. The tasks need to be clearly outlined bearing in mind the persons who are going to perform these tasks. Most of the Engineer project is normally very clear and anybody can be able to understand just what the engineer wants to build when they take a look at the plan of the engineer.


You then need to gather the resources that are required for the project. The resources need to be clearly outlined and the budget stated as it is anticipated to be. This is the only way you are going to be sure that the project management will run smoothly. The resources are very important because without these then the project may not proceed as it is supposed to proceed. Resources in this case include time, money and the people just to mention a few.



While doing the project planning you also need to be very clear on when you would like to start the project and when you anticipate the project will be complete. You need to state this very well taking into consideration the different activities that are going to take place for the success of the project. You have to make sure that you set a timeline that is reasonable. One that is not too long or too short but just the right timeline for the success of the project.


Finally when you have done all these, you need to make sure that there is a monitoring system in place. The Engineer project needs to be monitored in different stages right from the start of the project. Monitoring will help you know whether or not you are doing things the right way so that you can make changes before it is too late. It is a system that will enable you to evaluate yourself as the project is going on and look where you can modify. It will also help you know the progress of the project and exactly what you are supposed to brief the client on incase they want to know who the project is doing.



Planning Engineering projects

Register


Register

Subscriptions


Subscriptions

Protected Content

The content you are trying to access is only available to members. Sorry.



Protected Content

Account


Account

Register


Register

Tuesday, 15 April 2014

Planning a project

Planning a project can be very hard for the first time project planners. It can be frustrating especially if you are unaware of where you are supposed to start the planning. If it is your first time doing project planning, there are certain things that you need to bear in mind that will help you make the project a success. The scope of this description is to help the first time project planners know exactly what they are supposed to do when planning projects for them to become a success.


Description


A project needs to have a need. If there is no need then you are just wasting your time planning the project. You need to make sure that the need is well defined in the plan of the project. The need for the project is like the window of opportunity that will help in making the project a success.



Gather as much information as you can about the project. Project planning needs to be holistic and so you need to do some research as you are planning the project. You need to know what you are getting yourself into and have all the information that you need to back up the information that you have.


The design of the project needs to be well done. A good design is very important as it helps people know exactly what you aim to achieve. It will help in creating a mental picture in the people who are going to be involved in the planning process and this will help fasten the planning process. It is also a good way of ensuring that you are able to meet the project deadline.


After you have come up with the design, you need to build a prototype. This will help you look at the practicality of the project. It will also help you get a better picture of the design. It is a good way of ensuring that any risks that are anticipated in the project are averted even before the project is started.


Once you have found risks or problems in the design, you need to go back to the drawing table and make another design that is without problems. There is no need to rush into starting the project so you can take your time as you come up with the final design. This however should be done bearing in mind the project deadline so you should not take too much time doing the redesign.


When everything is completed, you now need to make a presentation of the results. By following these processes, you can be sure that the results that you are preventing are valid and the project is something that can be implemented. These processes require that you dedicate a lot of your time, effort and that you seek advice from people who have the experience of planning successful projects. Going at it alone is too cumbersome and will cause too much frustration on your side.



Planning a project

Monday, 14 April 2014

Managing troublesome locals

 


While you are working on a construction project, you are bound to have the neighbors and the people living around the construction coming to find out what is going on. Some will just look and go; others will want to stroll around the construction while others will mess with your equipment. This description aims to help you know the best way to deal with these troublesome locals so that you can be able to do your work in one peace.


Description


The place that you are working on can be enclosed. You need to build and enclosure for the construction that you are working on. This will not only help you in managing locals’ entry and exit from the site, it will also help you in protecting the passersby from health hazards. You can use second hand material for this so that you can save.



Putting a sign post on the enclosure is also a good idea. People will most definitely be curious to know what is going on in the site. So as to save them the time of having to come in and ask too many questions, you can simply put up a post for them. The post can have a picture of the construction that is being done and also some information about the engineers. It is also a good way of removing doubts from people who have suspicious ideas about the construction.


Troublesome locals can also be managed by making sure that people working in the construction site have some form of identification. This will help to restrict the people entering the site as only those who are working in the site will get entry to the site. You can ensure this by placing a guard at the entrance of the enclosed site area that will be looking at the identification of the people getting into the premises.


Managing locals can also be made easy by you are the project manager making sure that you abode by the society norms. If the locals feel that you are not abiding by their norms, they will give you a hard time but if they don’t feel like so then you will have a very easy time with them. So you have to make sure that you have done some background check on them and are aware of what they do not approve of.


Informing the local authorities is also very important. You need to make the local authorities aware of what you are doing. This will make your work easier because you will always have the support of the local authorities. It will also be very beneficial to inform the local authorities what you are doing because when people go to report negative things that are not true about the projects then you are you are going to be on the safe side.


Treating people with respect is very important. No matter how the locals behave you have to make sure that you treat them with respect.




Managing troublesome locals

Sunday, 13 April 2014

Supervision and monitoring project

For the success of any project, you need to make sure that there is a monitoring and supervision system in place. This is important because it is going to assist you track the progress of the project and make any corrections to the project if need be. The scope of this procedure is to assist you develop a good project monitoring system that will be effective in following up the project and ensuring that it is a success.


Procedure


Making sure that you have a good plan is very important when it comes to monitoring the project. You can develop a desk supervision mechanism where you will be assessing the project from time to time right from the beginning to the end of the construction project. You need to write down the steps that you are going to use as well as the progress of the construction as you are doing the monitoring.



At the beginning of the project, there are certain things that you need to look at. The practicality of the work is one of these things. You need to look at whether or not the work is feasible and if you have all the resources that you will need in the execution of the work. This means that at this stage, what you need to focus on is the probability of the work being done. There is also need to assess the possible risks that you may encounter and consider if the project will be worth the risks or ways of averting these possible risks.


Once you are done with the initial supervision and you have seen that the project will be able to start without too many issues, you then need to establish a monitoring system for the execution stage. It is important that throughout the project you continuously look at the methodology that you had initially come up with in the planning phase paying close attention to the possible risks that you might encounter and coming up with ways of managing these risks. This should always be at the back of your mind even as you go on with your project management activities.


Once you are done with the initial and the execution phases without any major problems and the project has come to an end, you also have to make sure that there is monitoring here. You need to remember that project management simply does not end here. You have to look and make sure that everything is in order just as it had initially been planned and that everything is good to go. This will help you know whether there is anything else that needs to be done and also help you have the confidence that all is well.


When doing the monitoring, you should never rush into the matter. You need to make sure that all of your steps are very well calculated and the monitoring is done in an effective manner. This will help you get the best out of the monitoring. You can decide to do it yourself or seek the help of an external party.



Supervision and monitoring project

How to Use Filter Option to Prepare Look Ahead Schedule

Before proceeding further with the FILTER option, we will look into LOOK AHEAD SCHEDULE which is a common report required in planning.


LOOK AHEAD SCHEDULE is the list of activities in a schedule which will take place in the near future say one week, two weeks, one month or so. The time period varies from project to project and cleint to client. But the idea in creating look ahead schedule is same whatever be the time contraint.


Let’s understand the conditions that should be considered while preparing a 2 week look ahead schedule one by one.


  1. Activity shouldn’t be completed – Normally, completed activities are not shown on the look ahead schedule since it has less significance in forecast.

  2. Start date of the activity should be within the range of 2 weeks from the Data date. (Data date is the current date or the last updated date of the schedule)

  3. Finish date of the activity should be within the range of 2 weeks from the Data date.

  4. Activity should be in progress.


Please go through the above conditions once again before we proceed how to enter them in Primavera P6.


If look into the below slide you can see there are some activities which are 100% completed, some of them 0% and some other are in progress.



Now let’ s apply the look ahead conditions which were mentioned above.



Step 1 – Go to filter option and click on ‘ NEW’ tab


Step 2 – Name the filter. In this case, let’s put it 2 week look ahead. Make sure that the parameter (which is highlighted in blue in the below slide) be ‘ All of the following’


Step 3 – Select ‘Activity status’ in the ‘parameter’ column, ‘is not equal to’ in the ‘is’ column, ‘Completed’ in the ‘Value’ column. Now we have completed the first condition ie activity shouldn’t be a completed one



Step 4 – Click on ‘ADD’ tab and this time give ‘Any of the following’ in the ‘Parameter’ column. Click on ‘ADD’ tab again and enter the other conditions also. Select ‘Start’ & ‘is within the range of’ in the ‘Parameter’ and ‘ Is’ column respectively and type ‘DD-1W’ and ‘DD+2W’ in the ‘Value’ and ‘High Value’ columns. Here DD stands for Data Date and 1W stands for 1 Week; which means we are taking the selecting the activities whose start dates are in the range of 1 week behind the Data Date and 2 weeks ahead of Data Date.


Click again on ‘ADD’ tab and provide the following conditions.


  1. ‘Finish’ in ‘Parameter’ column , ‘ is within range of’ in ‘is’ column, ‘DD-1W’ in ‘Value column’ & ‘DD+2W’ in ‘ High Value’ column.

  2. ‘Activity Status’ in ‘Parameter’ column, ‘equals’ in ‘Is’ column, ‘In progress’ in Value column.

Hope you would be thinking why we gave ‘Any of the following’ condition here. The reason is, if any of the activity whose start date or finish date is within the range of DD-1W and DD+2W will fall into our look ahead schedule.



Step 5 – Click ‘OK’ tab and see the new filter has been made as 2 week look ahead and it is marked.



Step 6 – Click ‘Apply’ tab. Now you can see that the activities which were 100% completed have been removed and all the activities listed are within the range of 2 weeks time. Please note the activity ‘ Multipurpose hall’ is still in the list since it is not yet completed even though the start date was 2nd July 2013.



Thanks to paul zacharia who prepared this article.



How to Use Filter Option to Prepare Look Ahead Schedule

Saturday, 12 April 2014

Managing stage boundaries

 


It is very important for one to always make sure that they are managing stage boundaries very well at each stage. This is because in doing so you are going to keep track of the project and know whether or not there is need to make any changes to the project. The scope of this description is to help project managers get the best out of the project by giving tips on how to manage the different project stages.


Procedure


There is need to review the stages that you are in each and every time. While doing the review you have to look at the need for the project to proceed to the next level. You need to make sure that the project is going on as planned before proceeding to the next level. Look at the set objectives and whether or not they are processes that are taking place re geared towards achieving these objectives. You need to be able to establish very clear project boundaries by making sure that you do not proceed to the next stage until you are sure that everything is going on as planned in that stage that you are in.



Preparation for the next stage needs to be done even before the stage is started but in doing so you have to make sure that you are not mixing it up with the current stage that you are in. This is something that project managers need to bear in mind while preparing for the next stage. Project stages can be very confusing if they are mixed up and this can further delay the project process completion as had been initially planned.


While in a specific stage of the project, there is need to learn from that stage. You should not just move on to the next stage without making sure that you have learned something. This information will help you in the other stages that you are proceeding to. Managing project boundaries does not mean that you forget the good or even the bad things that have occurred in a particular stage. You can learn what to do and even what not to do as you are proceeding on to the different stages.


You need to bear in that the focus of each and every project is to make sure that there will be overall positive benefits of the project. You have to know that if a particular project stage is not working well the overall project can become a failure. So you have to be very careful at each and every stage of the project.


The success and the failure of the different stages will depend on your project management. You need to make sure that you manage each and every stage very well. You also need to prepare very well for each and every stage that you are about to proceed. In doing so you can be sure that the project will run smoothly and be completed at the right time.



Managing stage boundaries

Friday, 11 April 2014

The Book that you MUST Read in Project Management

Effective Project Management: Traditional, Agile, Extreme, Sixth Edition is a MUST read book. Whether you are an expert or a beginner, you must read this book by Robert K. Wysocki, Ph.D. The author of this book has more than 40 years of experience as a project management consultant and trainer. Furthermore, he refer to the Project Management Institute PMI process groups and knowledge area as a basis of his explanations.



My Reading Through Effective Project Management Text Book


 Page xxvi


“The contemporary project environment is characterized by high speed, high change, lower costs, complexity, uncertainty, and a host of other factors.”


 ”Effective project management is not the product of a rigid or fixed set of steps and processes to be followed on every project. Rather the choice of project management approach is based on having done due diligence on the project specifics and defined an approach that makes sense.”


 Page xxvii


“The extent to which change is expected will affect the choice of a best-fi t PMLC model.”


 Page xxx


  • When the goal and solution are clear, it generates the Traditional Project Management (TPM) category.

  • When the goal is clear but the solution is not, it generates the Agile Project Management (APM) category.

  • When neither the goal nor the solution is clear, it generates the Extreme Project Management (xPM) category.

  • And finally when the goal is not clear but the solution is, it generates the Emertxe Project Management (MPx) category (though this may seem nonsensical, it is not — more on this one later).

 Page xxxi


Every project that has ever existed or will exist falls into one and only one of these four categories. Each category gives rise to a PMLC, and each PMLC has at least one specific project management approach in it. This four-category classification gives rise to five PMLC models. It is these models — their recognition and use — that is the subject of this book.


 The definition of project management “organized common sense”


 Continue at page xxxvi


Page 164


The WBS is a hierarchical description of all work that must be done to complete the project as defined in the RBS


 Page 166


The terms “activity” and “task” have been used interchangeably among project managers and project management software packages. Some think of activities being made up of tasks, others say that tasks are made up of activities, and still others use one term to represent both concepts. In this book, I refer to higher-level work as activities. An activity is composed of two or more tasks. When the tasks that make up an activity are complete, the activity is complete.


 Page 167


Uses for the WBS


The WBS has four uses: as a thought-process tool, an architectural-design tool, a planning tool, and a project-status-reporting tool.


 Joint Project Planning Session (JPPS).


 Page 169


WARNING Do not build the WBS by walking around the workplace or e-mail space and asking participants to complete their part of the WBS. It may


seem like a faster way to generate the WBS and it is much easier than conducting the JPPS, but it is a ticket to failure. You need several pairs of eyes looking


at the WBS and critiquing it for completeness.


 Page 172


Six Criteria to Test for Completeness in the WBS


Developing the WBS is the most critical part of the JPPS. If you do this part right, the rest is comparatively easy. How do you know that you’ve done this


right? Each activity must possess the following six characteristics in order for the WBS to be deemed to be complete — that is, completely decomposed. When


an activity has reached that status, it changes from an activity to a task. The six characteristics that an activity must possess to be called a task are as follows:


  • Status and completion are measurable.

  • The activity is bounded.

  • The activity has a deliverable.

  • Time and cost are easily estimated.

  • Activity duration is within acceptable limits.

  • Work assignments are independent.

 Pages 176 & 177


The three general approaches to building the WBS are as follows:


Noun-type approaches — These approaches define the deliverables of the project work in terms of the components (physical or functional).


These are the requirements that populate the RBS. This approach is the one currently recommended by PMI.


Verb-type approaches — These approaches define the deliverable of the project work in terms of the actions that must be done to produce that


deliverable. Verb-type approaches include the design-build-test-implement and project objectives approaches. This approach was recommended by


PMI prior to the current release of PMBOK.


Organizational approaches — These approaches define the deliverable of the project work in terms of the organizational units that will work on


the project. This type of approach includes the department, process, and geographic location approaches.


Page 183


Estimation is the one area where most project teams have trouble. For one thing, there is no consistency. One person might be optimistic, another pessimistic,


and you won’t know which unless you have had prior substantiating evidence of one or the other.


 Page 184


The duration of a project is the elapsed time in business working days, not including weekends, holidays, or other non-work days.


Work effort is labor required to complete a task. That labor can be consecutive or nonconsecutive hours.


 Page 185


NOTE When estimating task duration, you have a choice to make: Do you want to estimate hours of billable labor to complete the task, or do you want to


estimate the clock time required to complete the task? You will probably want to do both. The labor hours are needed in order to bill the client. The elapsed


clock time is needed to estimate the project completion date. Some project managers will estimate labor and convert it to duration by dividing labor time


by an established efficiency factor, typically ranging from 0.6 to 0.75.


 The duration of a task is influenced by the amount of resources scheduled to work on it.


 Page 186


The crashpoint is the point where adding more resources will increase task duration.


 A second consideration for the project manager is the amount of reduction in duration that results from adding resources. The relationship is not linear.


Consider the chair example again.


 By adding the nth person to a task, you create the need for n more communication links. Who is going to do what? How can the work of several people be coordinated?


 Page 187


For example, painting a house is a partition able task. Rooms can be done by different painters, and even each wall can be done


by a different painters. The point of diminishing returns is not an issue here. Conversely, the task of writing a computer program may not be partition able at


all. Adding a second programmer creates all kinds of work that wasn’t present with a single programmer — for example, choosing a language and/or naming


conventions to use, integration testing, and so on.


 Variation in Task Duration


Because you cannot know what factors will be operative when work is underway on a task, you cannot know exactly how long it will take. There will, of course, be varying estimates with varying precision for each task. One of your goals in estimating task duration is to define the task to a level of granularity such that your estimates have a narrow variance — that is, the estimate is as good as you can get it at the planning stages of the project.


 Varying skill levels Your strategy is to estimate task duration based on using people of average skills assigned to work on the task. In actuality, this may not happen. You may get a higher- or lower-skilled person assigned to the task, causing the actual duration to vary from planned duration. These varying skill levels will be both a help and a hindrance to you.


Unexpected events — Murphy’s Law is lurking around every bend in the road and will surely make his presence known, but in what way and at what time you do not know. Random acts of nature, vendor delays, incorrect shipments of materials, traffic jams, power failures, and sabotage are but a few of the possibilities.


Efficiency of worker’s time — Every time a worker is interrupted, it takes additional time to get back to the level of productivity attained prior to the interruption. You cannot control the frequency or time of interruptions, but you do know that they will happen. As to their effect on staff productivity, you can only guess. Some will be more affected than others.


Mistakes and misunderstandings — Despite all of your efforts to clearly and concisely describe each task that is to be performed, you will most


likely miss a few. This will take its toll in rework or scrapping semi completed work.


 Page 188


Common cause variation — A task’s duration will vary simply because duration is a random variable. The process has a natural variation, and there is nothing you do can to cause a favorable change in that variation. It is there and must be accepted.


 Six Methods for Estimating Task Duration


  • Similarity to other activities

  • Historical data

  • Expert advice

  • Delphi technique

  • Three-point technique

  • Wide-band Delphi technique

 Page 189


Applying the Delphi Technique


The Delphi technique can produce good estimates in the absence of expert advice. This is a group technique that extracts and summarizes the knowledge of the group to arrive at an estimate. After the group is briefed on the project and the nature of the task, each individual in the group is asked to make his or her best guess of the task duration. The results are tabulated and presented to the group in a histogram labeled First Pass, as shown in Figure 5-9. Participants whose estimates fall in the outer quartiles are asked to share the reason for their guess. After listening to the arguments, each group member is asked to guess again. The results are presented as a histogram labeled Second Pass, and again the outer quartile estimates are defended. A third guess is made, and the histogram plotted is labeled Third Pass. Final adjustments are allowed. The average of the third guess is used as the group’s estimate. Even though the technique seems rather simplistic, it has been shown to be effective in the absence of expert advice.


delphi technique


Page 190 and 191


Applying the Three-Point Technique


Task duration is a random variable. If it were possible to repeat the task several times under identical circumstances, duration times would vary. That variation may be tightly grouped around a central value, or it might be widely dispersed.


Optimistic — The optimistic time is defined as the shortest duration one has experienced or might expect to experience given that everything happens as expected.


Pessimistic — The pessimistic time is that duration that one would experience (or has experienced) if everything that could go wrong did go wrong, yet the task was completed.


Most likely — The most likely time is that time that they usually experience.


three point technique


Then the estimated duration is given by the formula (O + 4M + P) / 6


 Applying the Wide-Band Delphi Technique


Combining the Delphi and three-point methods results in the wide-band Delphi technique. It involves a panel, as in the Delphi method. In place of a single estimate, the panel members are asked, at each iteration, to give their optimistic, pessimistic, and most likely estimates for the duration of the chosen task. The results are compiled, and any extreme estimates are removed. Averages are computed for each of the three estimates, and the averages are used as the optimistic, pessimistic, and most likely estimates of task duration.


I am strongly recommending this Book. search for it and read it. The following is the book link on Amazon.